Solar PV farms
Statutory inspection, frequency and related regulatory watch
Everything you need to keep your solar pv farms compliant: frequency, statutory reference, competent bodies, documents to produce and recommended regulatory watch.
Frequency
Every 12 months
Statutory reference
IEC 62446 / BS 7671 s. 712
Expected document
Inspection report + health & safety register
Main obligations
- Inspection every 12 months is mandatory (IEC 62446 / BS 7671 s. 712).
- Initial inspection when commissioning or re-commissioning after a significant modification.
- Maintain a health & safety register in line with applicable UK HSE regulations.
- Retain reports for at least 5 years, and for the full asset lifetime for the initial inspection.
- Close out defects promptly and keep an auditable trail of corrective actions.
What our software automates
- Schedule and early alerts (T-60, T-30, T-7) for every asset.
- Checklists aligned with applicable UK regulations, signed electronically on mobile.
- Asset identification via QR code or NFC tag attached to the equipment (document pouch).
- Automatic generation of timestamped PDF reports and defensible archive.
- Defect tracking, repair costs and full CMMS history.
- Automatic updates when regulations change (built-in regulatory watch).
Other assets in the industry Energy
Onshore & offshore wind turbines
Every 12 months • IEC 61400 / GWO
HV/LV substations
Every 12 months • ESQCR 2002 / BS 7671
HV distribution installations
Every 12 months • EAWR 1989
Diesel gensets
Every 12 months • BS EN ISO 8528
Battery energy storage (BESS)
Every 12 months • IEC 62933 / BS EN 62619
Distribution lines & networks
Every 12 months • ESQCR 2002
Keep your assets fully compliant
Centralise inspections, automate due-date reminders and generate your statutory registers in one click. Personalised demo within 24 hours.