Thorough examination of lifting equipment
Primary framework for lifting examinations: 6-monthly for lifting of persons / 12-monthly for lifting of loads, load tests, report content and register duties.
Thorough examinations, commissioning and ad-hoc inspections on every asset
The Inspections module covers the full statutory examination cycle end-to-end: scheduling, offline field execution, automated compliant reporting and time-stamped archiving. It aligns with LOLER 1998 Regulation 9, PUWER 1998 Reg. 6, PSSR 2000 Written Schemes and the record-keeping duties of HSWA 1974.
Inspections is the core Cloud VGP module: it unifies thorough examinations, commissioning inspections, return-to-service checks and ad-hoc inspections in one mobile, offline-first, defensible platform. A field engineer completes an inspection in under 8 minutes on average, with a time-stamped, eIDAS-signed PDF report auto-archived.
Go deeper into this topic with our educational reference material.
Lifting, PPE, electrical, gas, fire, pressure systems, lifts, automatic doors, wind, PV, nuclear.
Pre-set templates aligned with LOLER, PUWER, PSSR and RRO 2005, eIDAS-grade signature and time-stamp.
Run inspections with no signal; automatic encrypted sync when back on Wi-Fi or 4G/5G.
Every finding becomes a tracked action with photo evidence and owner.
Primary framework for lifting examinations: 6-monthly for lifting of persons / 12-monthly for lifting of loads, load tests, report content and register duties.
Initial, periodic and ad-hoc inspections. Records kept and available to HSE inspectors under Reg. 6(4).
Cat. III fall-arrest PPE: annual thorough inspection by a competent person, traceability by serial number.
6-monthly examinations, commissioning and return-to-service after modification.
EICR every 3 to 5 years, initial verification, periodic testing per BS 7671 (18th edition).
Category III: mandatory annual thorough inspection, serial-number traceability.
Inspection of equipment in Zone 0/1/2 (gas) and 20/21/22 (dust), Explosion Protection Document and register.
Written Scheme of Examination, requalification, commissioning inspections — evidence pack expected by the HSE.
Over 400 pre-configured checklists cover asset families subject to LOLER, PUWER, PSSR, HSE regulations and applicable British Standards.
Smart scheduler aligned with statutory intervals. Assignment to examiners by site, competence and accreditation. Alerts at T-60 / T-30 / T-7 days for the operator and the dutyholder.
Rich asset record (make, serial, history, manual), standard-specific checklist, permit-to-work, method statement and required PPE loaded automatically on mobile.
Tablet or smartphone inspection, no signal required: geo-tagged photos, measurements, load tests, image annotations, QR/NFC scan for instant asset identification.
PDF report generated in the regulatory format, eIDAS-signed (qualified), time-stamped and sealed. Immediate e-mail to the client and to the digital safety register.
Findings become tracked actions with named owners and before/after photos. Close-out logged, client notified, re-inspection triggered automatically when required.
Time-stamped archive kept for a minimum of 10 years, instant access for the HSE, local authority or insurer. Per-site or per-client ZIP export in one click.
Context: 20 examiners on the road, 8,000 assets to examine every year across 500 clients, contract commitment to deliver reports within 48 hours.
Outcome: 60% less administrative time, +35% inspections per examiner, zero lost report.
Context: Upper-tier COMAH site with 1,200 pressure, DSEAR, lifting and PPE assets, full audit trail required.
Outcome: Safety register always up to date, HSE audit prep divided by 5, proactive alerts.
Context: Fleet of 800 MEWPs, forklifts and cranes hired across the UK, LOLER must be current at every hire.
Outcome: Hire blocked automatically if thorough examination has lapsed, hirer scans a QR code to see history.
Context: Portfolio of 120 commercial buildings, several external contractors, need to centralise every inspection.
Outcome: Real-time consolidated view, per-site compliance dashboard, simplified contractor coordination.
Statutory thorough examinations across every asset family
First and return-to-service inspections for new or repaired assets
Explosion protection and hazardous area equipment
EICR, PAT and fixed installation testing under EAWR 1989
Annual thorough inspection of Category III PPE
Fire alarm, emergency lighting, extinguishers, AOV
Personalised demo or a 30-day free trial, no credit card.
Analyses, statutory instruments and deadlines to know to stay compliant on this module.
HSE ACoP L122 update reminds duty holders that a WSE without pressure/volume calculations, hazard category, and named competent person is not compliant.
HSE 2026 sector plan makes explicit that in-house competent persons must be demonstrably independent from operations, or a UKAS-accredited third party should carry out the thorough examination.
A single digital register consolidating LOLER, PUWER, PSSR, COSHH LEV, WAHR and EAWR records is now the expected benchmark on HSE inspections in manufacturing and logistics.
Keep reading with the most-visited pages on Cloud VGP.
Mission, sector focus and what sets a field-first LOLER platform apart.
ContinueHow inspection bodies, industrial sites and operators run their compliance day-to-day.
ContinueCost simulator for enterprises, industrial sites and inspection bodies. Cancel any time.
ContinuePreventive and reactive maintenance tied to LOLER, PUWER and other statutory checks.
ContinueWe value your privacy
We use cookies to improve your experience, analyse traffic and personalise content. You can choose which cookies you accept. Read our Privacy Policy.