- Home
- Regulatory updates
- Pressure systems
Pressure systems (PSSR)
The Pressure Systems Safety Regulations 2000 (PSSR) require the user to have a Written Scheme of Examination (WSE) drawn up by a competent person covering all relevant parts of the system, and to ensure the system is examined in accordance with that scheme.
Detailed inspection obligations
Includes air receivers > 250 bar·litre, autoclaves, steam boilers and process vessels.
| Object of inspection | Type | Frequency | Who | Record | Reference |
|---|---|---|---|---|---|
| Preparation and periodic review of the Written Scheme of Examination (WSE) | Document — technical review by competent person | Reviewed at appropriate intervals; re-issued whenever the plant changes materially | Competent person (typically UKAS-accredited engineering surveyor) | Written Scheme of Examination — retained for the life of the plant | PSSR 2000 reg. 8 · ACoP L122 |
| Periodic thorough examination in accordance with the WSE | In-service inspection (internal / external / functional) | As specified in the WSE — typically 12 to 72 months depending on hazard category | Competent person named in the WSE | Report of Examination — retained until superseded by the next report + 2 years | PSSR 2000 reg. 9 |
| Object of inspection | Type | Frequency | Who | Record | Reference |
|---|---|---|---|---|---|
| Safety devices (safety valves, water level controls) function test | Functional test | Per WSE (typically 12 months for shell boilers) | Competent person | Boiler examination record | PSSR 2000 · BG01 (Guidance on the Safe Operation of Steam Boilers) |
Source. Content synthesised from HSE guidance and the source publication Statutory thorough examinations — UK duty holder overview (HSE ACoPs & BS EN standards, Updated 2026) This page is no substitute for the regulations in force or for a competent person's inspection report.
Manage these obligations with Cloud VGP
Software modules that cover the inspections in this category.
Pressure Systems
PSSR Written Scheme of Examination management
Explore featureInspections
Thorough examinations, commissioning and ad-hoc inspections on every asset
Explore featureThorough Examinations
Statutory thorough examinations across every asset family
Explore featureElectrical
EICR, PAT and fixed installation testing under EAWR 1989
Explore feature