Tail lifts
Statutory inspection, frequency and related regulatory watch
Everything you need to keep your tail lifts compliant: frequency, statutory reference, competent bodies, documents to produce and recommended regulatory watch.
Frequency
Every 6 months
Statutory reference
LOLER 1998
Expected document
Inspection report + health & safety register
Main obligations
- Inspection every 6 months is mandatory (LOLER 1998).
- Initial inspection when commissioning or re-commissioning after a significant modification.
- Maintain a health & safety register in line with applicable UK HSE regulations.
- Retain reports for at least 5 years, and for the full asset lifetime for the initial inspection.
- Close out defects promptly and keep an auditable trail of corrective actions.
What our software automates
- Schedule and early alerts (T-60, T-30, T-7) for every asset.
- Checklists aligned with applicable UK regulations, signed electronically on mobile.
- Asset identification via QR code or NFC tag attached to the equipment (document pouch).
- Automatic generation of timestamped PDF reports and defensible archive.
- Defect tracking, repair costs and full CMMS history.
- Automatic updates when regulations change (built-in regulatory watch).
Recommended regulatory watch
Category 3
Lifts, hoists and MEWPs
Passenger and goods lifts, work platforms and MEWPs used at work are lifting equipment for the purposes of LOLER 1998. Passenger lifts installed on or after 1999 must additionally satisfy the Lifts Regulations 2016.
Category 4
Cranes, forklifts and lifting accessories (LOLER)
Cranes, forklift trucks, telehandlers, chains, slings, shackles and eyebolts fall under LOLER 1998. Duty holders must ensure lifting equipment is strong and stable for each intended use, and thoroughly examined at the statutory intervals.
Category 8
Docks, ports & shipyards
The Docks Regulations 1988 and MCA guidance require inspection of lifting appliances used in docks and shipyard access equipment, complemented by LOLER for lifting operations onshore.
Other assets in the industry Transport & Logistics
ADR road tankers
Hydrostatic test every 6 years • ADR 2023 / CDG 2009
Vehicle-mounted lorry loaders (HIAB)
Every 6 months (persons) / 12 months (loads) • LOLER 1998
Forklifts & MHE
Every 12 months • LOLER 1998
Loading bays & dock levellers
Every 12 months • PUWER 1998 / BS EN 1398
Pallet racking
Annual PRRS + weekly visual • SEMA / HSG76
Industrial sectional doors
Every 12 months • BS EN 13241 / PUWER 1998
Keep your assets fully compliant
Centralise inspections, automate due-date reminders and generate your statutory registers in one click. Personalised demo within 24 hours.