Scaffold inspection: moving from paper F91 to a digital, geolocated record
Under WAHR 2005 reg. 12, every scaffold used at work must be inspected before use, every 7 days, and after adverse weather. Moving that record digital is not just compliance — it's how audits are won.
The 7-day rule is a minimum, not a target
WAHR 2005 requires scaffold inspection before first use, every 7 days, and after any event likely to affect stability (adverse weather, alteration). NASC TG20 is the working reference for tube-and-fitting and system scaffolds. A CISRS Advanced or equivalent competent person must sign each inspection.
Digital F91 with photos and GPS
Cloud VGP replaces the paper Form F91 with a mobile inspection: each check point is photographed with GPS and timestamp, the scaffold ID is scanned via QR/NFC, and the report is signed on screen. The Principal Contractor sees the live status of every scaffold on every site — and the CDM file writes itself.
Immediate action plan
- 1Print a QR code on every scaffold at hand-over.
- 2Enforce a 7-day inspection cadence with automated escalation to the Principal Contractor.
- 3Consolidate all scaffold F91 records in one digital H&S register accessible offline.
Does this obligation apply to your assets?
Our Insights module automatically filters regulations relevant to your asset portfolio and reschedules the affected inspections. 20-minute demo.
Tool up on this topic
The Cloud VGP modules and sectors that directly address this duty.
Permit to Work
Digital permit-to-work and contractor coordination
Explore featureE-Signature
eIDAS-grade electronic signature, retained UK
Explore featureDrone
Non-invasive drone inspections for hard-to-reach assets
Explore featureTanks
Fuel tanks, chemical vessels and bunds
Explore feature