Practical guide

    Preparing for a Thorough Examination: complete UK checklist

    Thousands of UK assets fall under statutory Thorough Examination (LOLER, PUWER, PSSR, PPE at Work). Here is the six-step method to approach every examination without defects, and to automate the whole cycle with dedicated software.

    1. List every asset in scope of Thorough Examination

    Build an exhaustive register of assets subject to statutory examination: lifting equipment (cranes, overhead cranes, FLTs, MEWPs, hoists), pressure systems (PSSR), fall-protection PPE, powered industrial doors and gates, storage racking. Each asset must carry a unique identifier (QR code or NFC tag) linked to its digital asset history.

    2. Gather the regulatory history of each asset

    Before the examination, the competent person will request the manufacturer's manual, the UKCA/CE declaration, the most recent Thorough Examination report, any incident reports and the maintenance history. Centralise everything on a single platform to avoid lost paper and speed up the inspection.

    3. Prepare the equipment technically

    Clean the areas to be inspected, check fluid levels, visually inspect wire ropes, chains, hooks and safety devices. Run functional tests (raise/lower, braking, limit switches, emergency stops). Log any anomaly straight into the mobile app so it can be addressed before the engineer surveyor arrives.

    4. Verify documentation and signage

    Legible rating plate, SWL/WLL displayed, safety pictograms in place, digital H&S register up to date: these are systematically checked. A documentary defect can result in the equipment being withdrawn from service, even when it is technically compliant.

    5. Close out defects from the previous examination

    Every observation or defect raised in the previous report must be closed and evidenced. Keep the evidence (invoices, work orders, before/after photos). An open defect is on its own enough to justify a non-conformity.

    6. Organise the day of the examination

    Nominate an on-site lead, clear access, prepare the PPE the engineer surveyor will need, safely isolate equipment for inspection. Allow 30 to 60 minutes per asset depending on complexity. At the end, the report is signed digitally and archived immediately.

    Automate TET preparation with dedicated software

    Managing Thorough Examinations by hand (spreadsheets, paper binders, Outlook reminders) leads to missed dates, lost reports and enforcement action. Cloud VGP centralises the asset register, scheduling, digital reports and defect close-out on one platform, accessible on the move via QR code and NFC.

    • Automatic scheduling of statutory due dates per asset family
    • Digitally signed reports, 10-year retention, one-click PDF export
    • Email and push alerts before every due date and for open defects
    • Multi-site compliance dashboard with drill-down to any asset
    • Structured invoicing for external competent persons

    Frequently asked questions

    What is the statutory frequency of a Thorough Examination in the UK?

    Frequency depends on the asset and the applicable regulation. As a guide: 6 months for equipment used to lift persons (MEWPs, suspended platforms) and for public passenger lifts under LOLER, 12 months for most load-lifting equipment (cranes, hoists), all lifting accessories and Category III fall-arrest PPE (PPE at Work Regs 2022), 3 months for certain heavy-use machinery under PUWER, and 12–72 months for pressure systems under the written scheme of examination (PSSR 2000). Frequency is shortened where use is intensive, the environment is harsh or after an incident. Cloud VGP calculates due dates automatically by asset family.

    Who can carry out a Thorough Examination?

    A Thorough Examination must be carried out by a competent person as defined in HSE guidance INDG422 and the relevant ACOPs. That can be an in-house appointed person, an independent competent person or an engineer surveyor from a UKAS-accredited body (a SAFed member such as Zurich, Allianz Engineering, HSB, Bureau Veritas or Applus+). Choice depends on the asset, the risk and, in some cases, on a specific requirement — for instance PSSR revalidation of a pressure vessel is generally carried out by a UKAS-accredited body. In every case, the person must have adequate practical and theoretical knowledge, appropriate measuring equipment and enough independence from the user. The competent person carries professional liability for the report.

    What is the risk of not carrying out statutory examinations?

    Under the Health and Safety at Work Act 1974 s.33 fines are unlimited and directors face up to 2 years' imprisonment. Sentencing Council guidelines set penalties by turnover: a Category A breach at a large employer can exceed £10m. Civil liability follows through personal injury claims. The HSE can serve improvement or prohibition notices requiring immediate withdrawal. Insurance cover for engineering breakdown or public liability may be void. Principal contractors in construction, industry and logistics require the reports as a condition of access.

    How do I digitalise the statutory inspection register?

    In four steps. First, build an up-to-date asset register with a unique identifier per asset (QR code or NFC tag). Second, define frequency and report templates per family, in line with the applicable regulation (LOLER, PUWER, PSSR). Third, run examinations on mobile — offline included — with photos, measurements, signatures and an auto-generated report. Fourth, track defects and corrective actions on a shared dashboard. A SaaS platform such as Cloud VGP handles the four steps on one platform, with no install, no lock-in and per-asset pricing (from £0.36 per asset per month, sliding scale).

    Which documents should I prepare before an examination?

    Before the engineer surveyor arrives, gather: the asset ID sheet (make, model, serial number, year, capacity), the manufacturer's manual and UKCA/CE declaration of conformity, the last Thorough Examination report and defect close-out history, the maintenance log, the H&S register, the competencies of the operators who use the asset. Also plan the access to the equipment (clearance, lighting, scaffold if needed), the PPE for the engineer surveyor and, for proof-load tests, the required test weights. Cloud VGP holds all of these in a digital asset log accessible via the asset's QR code.

    How should I handle a defect raised during a Thorough Examination?

    Grade every defect: existing (fix by the next due date), imminent (fix in a short window, typically 15 to 30 days), or defect becoming a danger to persons (immediate withdrawal from service). Each defect opens a corrective action assigned to a responsible person, with a due date and required evidence of close-out (photo, work order, invoice). The asset must not be returned to service without documented close-out. Cloud VGP automates the cycle: action opened on report close, owner notified, re-use lock until evidence is attached, full close-out history available at audit.

    Do I need a fresh examination after a repair or modification?

    Yes, in several scenarios. After a significant modification (structural change, replacement of a safety device, capacity change, transformation of the mounting), a post-modification examination is required (LOLER reg 9(3), PUWER reg 6). After a major repair or an incident (impact, overload, fall), a further examination is needed before return to service. After an extended out-of-service period (typically over three months), the same rule applies. These examinations do not replace the periodic one — they add to it. Cloud VGP automatically creates a post-modification examination the moment an operator logs a modification, major repair or incident.

    How much does outsourcing Thorough Examinations cost?

    Cost varies by asset type, location, complexity and the provider. As a guide: a simple lifting-accessory examination is £30–£60 excl. VAT, a forklift truck £80–£150, a MEWP £100–£200, a tower crane £400–£1,200 with a proof-load test. Travel is on top. Digitalisation reduces the total bill by optimising route planning, eliminating rekeying and industrialising report production. At £0.36 per asset per month, Cloud VGP costs less than a single annual outsourced examination of a lifting accessory.