Written Scheme of Examination: what a good PSSR WSE actually contains
HSE ACoP L122 update reminds duty holders that a WSE without pressure/volume calculations, hazard category, and named competent person is not compliant.
Fire alarm, emergency lighting, extinguishers, AOV
The Regulatory Reform (Fire Safety) Order 2005 imposes a full duty on the responsible person: fire risk assessment, servicing of every life-safety system, and an accessible fire log book.
RRO 2005 evidence pack always ready.
BS 5839, BS 5306, BS 5266, BS 7346, BS 8214.
Fire risk assessment actions tracked with photo evidence.
Personalised demo or a 30-day free trial, no credit card.
Analyses, statutory instruments and deadlines to know to stay compliant on this module.
HSE ACoP L122 update reminds duty holders that a WSE without pressure/volume calculations, hazard category, and named competent person is not compliant.
HSE 2026 sector plan makes explicit that in-house competent persons must be demonstrably independent from operations, or a UKAS-accredited third party should carry out the thorough examination.
HSE reiterates that portable appliance testing intervals should be risk-based, not calendar-based — and that safe isolation, not PAT frequency, is the priority.
Keep reading with the most-visited pages on Cloud VGP.
Mission, sector focus and what sets a field-first LOLER platform apart.
ContinueHow inspection bodies, industrial sites and operators run their compliance day-to-day.
ContinueCost simulator for enterprises, industrial sites and inspection bodies. Cancel any time.
ContinuePreventive and reactive maintenance tied to LOLER, PUWER and other statutory checks.
ContinueWe value your privacy
We use cookies to improve your experience, analyse traffic and personalise content. You can choose which cookies you accept. Read our Privacy Policy.