Written Scheme of Examination: what a good PSSR WSE actually contains
HSE ACoP L122 update reminds duty holders that a WSE without pressure/volume calculations, hazard category, and named competent person is not compliant.
The six mandatory elements
1) A description of the plant and its safe operating limits; 2) the identity of the competent person; 3) the parts of the system to be examined; 4) the nature of the examination (external, internal, functional); 5) the frequency of examination; 6) any preparatory work required. A WSE missing any of these six is defective, and the plant should not be operating on it.
How Cloud VGP structures the WSE
Every pressure asset in Cloud VGP carries a WSE record with the six elements above, versioned and signed by the competent person. The engineer running the next thorough examination is prompted with the WSE preparatory work and cannot close the inspection without linking to the WSE version in force.
Immediate action plan
- 1Audit each WSE against the six ACoP L122 elements.
- 2Re-issue any WSE older than 5 years or where the plant has changed materially.
- 3Store WSEs and Reports of Examination in a single digital register — retain for the life of the plant.
Does this obligation apply to your assets?
Our Insights module automatically filters regulations relevant to your asset portfolio and reschedules the affected inspections. 20-minute demo.
Tool up on this topic
The Cloud VGP modules and sectors that directly address this duty.
Pressure Systems
PSSR Written Scheme of Examination management
Explore featureInspections
Thorough examinations, commissioning and ad-hoc inspections on every asset
Explore featureThorough Examinations
Statutory thorough examinations across every asset family
Explore featureCommissioning
First and return-to-service inspections for new or repaired assets
Explore feature