COSHH LEV thorough examination: the 14-month clock is stricter than you think
The 14-month interval in COSHH reg. 9 is a maximum, not a target. HSG258 sets the technical bar — and Cloud VGP tracks the P601 competent-person qualification alongside.
Auto-scheduled.
Face velocities, static pressure, flow rate.
For workplace exposure monitoring.
Personalised demo or a 30-day free trial, no credit card.
Analyses, statutory instruments and deadlines to know to stay compliant on this module.
The 14-month interval in COSHH reg. 9 is a maximum, not a target. HSG258 sets the technical bar — and Cloud VGP tracks the P601 competent-person qualification alongside.
A single digital register consolidating LOLER, PUWER, PSSR, COSHH LEV, WAHR and EAWR records is now the expected benchmark on HSE inspections in manufacturing and logistics.
Under WAHR 2005 reg. 12, every scaffold used at work must be inspected before use, every 7 days, and after adverse weather. Moving that record digital is not just compliance — it's how audits are won.
Keep reading with the most-visited pages on Cloud VGP.
Mission, sector focus and what sets a field-first LOLER platform apart.
ContinueHow inspection bodies, industrial sites and operators run their compliance day-to-day.
ContinueCost simulator for enterprises, industrial sites and inspection bodies. Cancel any time.
ContinuePreventive and reactive maintenance tied to LOLER, PUWER and other statutory checks.
ContinueWe value your privacy
We use cookies to improve your experience, analyse traffic and personalise content. You can choose which cookies you accept. Read our Privacy Policy.