Nuclear ventilation systems
Statutory inspection, frequency and related regulatory watch
Everything you need to keep your nuclear ventilation systems compliant: frequency, statutory reference, competent bodies, documents to produce and recommended regulatory watch.
Frequency
Every 12 months
Statutory reference
BS 5726 / NS-TAST
Expected document
Inspection report + health & safety register
Main obligations
- Inspection every 12 months is mandatory (BS 5726 / NS-TAST).
- Initial inspection when commissioning or re-commissioning after a significant modification.
- Maintain a health & safety register in line with applicable UK HSE regulations.
- Retain reports for at least 5 years, and for the full asset lifetime for the initial inspection.
- Close out defects promptly and keep an auditable trail of corrective actions.
What our software automates
- Schedule and early alerts (T-60, T-30, T-7) for every asset.
- Checklists aligned with applicable UK regulations, signed electronically on mobile.
- Asset identification via QR code or NFC tag attached to the equipment (document pouch).
- Automatic generation of timestamped PDF reports and defensible archive.
- Defect tracking, repair costs and full CMMS history.
- Automatic updates when regulations change (built-in regulatory watch).
Recommended regulatory watch
Category 1
Local Exhaust Ventilation (LEV) & workplace ventilation
COSHH reg. 9 requires that engineering controls provided to control exposure to hazardous substances — typically LEV systems — are examined and tested at suitable intervals. HSG258 sets out the industry-standard methodology for LEV thorough examination and test.
Category 2
Pressure systems (PSSR)
The Pressure Systems Safety Regulations 2000 (PSSR) require the user to have a Written Scheme of Examination (WSE) drawn up by a competent person covering all relevant parts of the system, and to ensure the system is examined in accordance with that scheme.
Other assets in the industry Defence & Nuclear
Polar cranes & reactor building lifting
Every 6 months • LOLER 1998 / ONR SAP
Nuclear pressure systems (NPS)
Per Written Scheme (typ. 4 to 10 years) • PSSR 2000 (nuclear scope)
Radiation detection instruments
Every 12 months • IRR 2017
Containment & glove boxes
Every 12 months • BS EN ISO 10648
Weapons & firing systems
Per JSP 375 • JSP 482 / MoD
Hardened hangars & sensitive facilities
Every 12 months • JSP 375 (MoD estate)
Keep your assets fully compliant
Centralise inspections, automate due-date reminders and generate your statutory registers in one click. Personalised demo within 24 hours.