Polar cranes & reactor building lifting
Statutory inspection, frequency and related regulatory watch
Everything you need to keep your polar cranes & reactor building lifting compliant: frequency, statutory reference, competent bodies, documents to produce and recommended regulatory watch.
Frequency
Every 6 months
Statutory reference
LOLER 1998 / ONR SAP
Expected document
Inspection report + health & safety register
Main obligations
- Inspection every 6 months is mandatory (LOLER 1998 / ONR SAP).
- Initial inspection when commissioning or re-commissioning after a significant modification.
- Maintain a health & safety register in line with applicable UK HSE regulations.
- Retain reports for at least 5 years, and for the full asset lifetime for the initial inspection.
- Close out defects promptly and keep an auditable trail of corrective actions.
What our software automates
- Schedule and early alerts (T-60, T-30, T-7) for every asset.
- Checklists aligned with applicable UK regulations, signed electronically on mobile.
- Asset identification via QR code or NFC tag attached to the equipment (document pouch).
- Automatic generation of timestamped PDF reports and defensible archive.
- Defect tracking, repair costs and full CMMS history.
- Automatic updates when regulations change (built-in regulatory watch).
Recommended regulatory watch
Category 4
Cranes, forklifts and lifting accessories (LOLER)
Cranes, forklift trucks, telehandlers, chains, slings, shackles and eyebolts fall under LOLER 1998. Duty holders must ensure lifting equipment is strong and stable for each intended use, and thoroughly examined at the statutory intervals.
Category 3
Lifts, hoists and MEWPs
Passenger and goods lifts, work platforms and MEWPs used at work are lifting equipment for the purposes of LOLER 1998. Passenger lifts installed on or after 1999 must additionally satisfy the Lifts Regulations 2016.
Category 8
Docks, ports & shipyards
The Docks Regulations 1988 and MCA guidance require inspection of lifting appliances used in docks and shipyard access equipment, complemented by LOLER for lifting operations onshore.
Other assets in the industry Defence & Nuclear
Nuclear pressure systems (NPS)
Per Written Scheme (typ. 4 to 10 years) • PSSR 2000 (nuclear scope)
Nuclear ventilation systems
Every 12 months • BS 5726 / NS-TAST
Radiation detection instruments
Every 12 months • IRR 2017
Containment & glove boxes
Every 12 months • BS EN ISO 10648
Weapons & firing systems
Per JSP 375 • JSP 482 / MoD
Hardened hangars & sensitive facilities
Every 12 months • JSP 375 (MoD estate)