Smoke ventilation & AOV
Statutory inspection, frequency and related regulatory watch
Everything you need to keep your smoke ventilation & aov compliant: frequency, statutory reference, competent bodies, documents to produce and recommended regulatory watch.
Frequency
Every 12 months
Statutory reference
BS 7346-8
Expected document
Inspection report + health & safety register
Main obligations
- Inspection every 12 months is mandatory (BS 7346-8).
- Initial inspection when commissioning or re-commissioning after a significant modification.
- Maintain a health & safety register in line with applicable UK HSE regulations.
- Retain reports for at least 5 years, and for the full asset lifetime for the initial inspection.
- Close out defects promptly and keep an auditable trail of corrective actions.
What our software automates
- Schedule and early alerts (T-60, T-30, T-7) for every asset.
- Checklists aligned with applicable UK regulations, signed electronically on mobile.
- Asset identification via QR code or NFC tag attached to the equipment (document pouch).
- Automatic generation of timestamped PDF reports and defensible archive.
- Defect tracking, repair costs and full CMMS history.
- Automatic updates when regulations change (built-in regulatory watch).
Recommended regulatory watch
Other assets in the industry Hospitality
Fire alarm system (BS 5839)
Every 6 months • BS 5839-1 / RRO 2005
Kitchen extract & canopies (TR/19)
Every 6 months • BESA TR/19
Commercial gas installations
Every 12 months • GSIUR 1998
Portable fire extinguishers
Annual + extended service • BS 5306-3
Hotel lifts
Every 6 months • LOLER 1998
Kitchen refrigeration
Every 12 months • F-Gas Reg. (retained UK)
Keep your assets fully compliant
Centralise inspections, automate due-date reminders and generate your statutory registers in one click. Personalised demo within 24 hours.