Industry

    Manufacturing & Industry

    Drive compliance across your production lines

    UK manufacturing operates a heterogeneous, mission-critical asset base: overhead cranes, pressure systems, special-purpose machines, robots and automated lines. Compliance rests on a rigorous cycle of LOLER thorough examinations, PSSR 2000 Written Schemes of Examination for pressure systems, and EAWR 1989 fixed-installation testing under BS 7671.

    Sector practical guide

    Educational resources to secure technical operations in this industry.

    Industry challenges

    • Minimising production downtime during inspections
    • New CE/UKCA plant coexisting with legacy assets
    • Technical file and manual management
    • Traceability of corrective actions after inspection

    Regulatory framework

    • PSSR 2000

      Pressure Systems Safety Regulations

    • PUWER 1998

      Provision and Use of Work Equipment Regulations

    • BS 7671

      IET Wiring Regulations (18th Edition)

    Relevant assets and inspection frequencies

    AssetFrequencyReference
    Overhead cranes & gantriesEvery 12 monthsLOLER 1998, Reg. 9
    Electric hoistsEvery 12 monthsLOLER 1998
    Pressure systems (PSSR)Per Written Scheme of ExaminationPSSR 2000
    Machine toolsEvery 12 monthsPUWER 1998
    Industrial robotsEvery 12 monthsPUWER 1998 / ISO 10218
    Air compressorsPer WSE (typ. 26 to 72 months)PSSR 2000
    Fixed electrical installationsEvery 3 to 5 years (EICR)EAWR 1989 / BS 7671
    Local exhaust ventilation (LEV)Every 14 monthsCOSHH 2002, Reg. 9

    Digitise compliance for your manufacturing

    Centralise your statutory inspections, automate due-date reminders and generate your compliance register in one click. Personalised demo within 24 hours.

    Frequently asked questions — Manufacturing

    Regulatory updates

    The latest obligations, statutory instruments and guidance applicable to this industry.

    All updates