Industry

    Rail

    Depots, track and stations

    UK rail (Network Rail, TOCs, FOCs, urban transport operators) stacks HSWA / LOLER duties with ROGS 2006, ORR expectations and RSSB standards (RIS documents). Cloud VGP handles depots, stabling points, signalling equipment rooms and station assets.

    Industry challenges

    • Interaction between tracks, depots and traffic
    • Sentinel and PTS authorisations for track workers
    • Tooling traceability by fleet class
    • Reporting to ORR and network operators

    Regulatory framework

    • ROGS 2006

      Railways and Other Guided Transport Systems Regulations

    • RSSB standards

      Rail Safety and Standards Board

    • Equality Act 2010 / RVAR

      Rail Vehicle Accessibility Regulations

    Relevant assets and inspection frequencies

    AssetFrequencyReference
    Depot overhead cranesEvery 12 monthsLOLER 1998
    Pit jacks & vehicle lifting columnsEvery 12 monthsLOLER 1998 / EN 1494
    Wheel lathes (in-pit)Every 12 monthsPUWER 1998
    Overhead line equipment (OLE)Every 12 monthsEAWR 1989 / RIS-1853
    Station lifts & escalatorsEvery 6 monthsLOLER 1998 / BS EN 115
    Passenger footbridges & platformsEvery 12 monthsEquality Act 2010 / RVAR
    Signalling & interlocking roomsPer RIS / Network Rail standardsRSSB / ORR
    Stabling & depot facilitiesEvery 12 monthsROGS 2006

    Digitise compliance for your rail

    Centralise your statutory inspections, automate due-date reminders and generate your compliance register in one click. Personalised demo within 24 hours.

    Frequently asked questions — Rail

    Regulatory updates

    The latest obligations, statutory instruments and guidance applicable to this industry.

    All updates